Abstract

We consider the total weighted completion time minimization in the following scheduling problem. There are m identical resources available at each time unit, and n jobs. Each job requires a number si of resources and one resource can only be assigned to one job at each time unit. Each job is also called fully parallel such that the job is satisfied once it receives enough resources no matter how the resources distribute. The objective is to find a schedule that minimizes ΣwiCi, where wi is the weight of job Ji and Ci is the time when job Ji receives si resources. We show that the total weighted completion time minimization is NP-hard when m is an input of the problem. We then give a simple greedy algorithm with an approximation ratio 2. Finally, we present a polynomial time algorithm with complexity O(nd+ 1) to solve this problem when the number of different resource requirements that are not multiples of m is at most d.

Original languageEnglish
Pages (from-to)34-40
Number of pages7
JournalTheoretical Computer Science
Volume507
DOIs
StatePublished - 7 Oct 2013
Externally publishedYes

Keywords

  • Algorithms
  • Integer parallel units
  • Machine scheduling
  • Parallel jobs
  • Weighted completion time

Fingerprint

Dive into the research topics of 'Minimizing the total weighted completion time of fully parallel jobs with integer parallel units'. Together they form a unique fingerprint.

Cite this