Scheduling fully parallel jobs

  • City University of Hong Kong
  • Shenzhen Institute of Advanced Technology

Research output: Contribution to journalArticlepeer-review

Abstract

We consider the following scheduling problem. We have m identical machines, where each machine can accomplish one unit of work at each time unit. We have a set of n fully parallel jobs, where each job j has sj units of workload, and each unit workload can be executed on any machine at any time unit. A job is considered complete when its entire workload has been executed. The objective is to find a schedule that minimizes the total weighted completion time ∑ wjCj, where wj is the weight of job j and Cj is the completion time of job j. We provide theoretical results for this problem. First, we give a PTAS of this problem with fixed m. We then consider the special case where wj= sj for each job j, and we show that it is polynomial solvable with fixed m. Finally, we study the approximation ratio of a greedy algorithm, the Largest-Ratio-First algorithm. For the special case, we show that the approximation ratio depends on the instance size, i.e. n and m, while for the general case where jobs have arbitrary weights, we prove that the upper bound of the approximation ratio is 1+m-1m+2.

Original languageEnglish
Pages (from-to)619-631
Number of pages13
JournalJournal of Scheduling
Volume21
Issue number6
DOIs
StatePublished - 1 Dec 2018
Externally publishedYes

Keywords

  • Approximation ratio
  • Integer parallel units
  • Parallel jobs
  • Total weighted completion time